Public water system record
Crosby MUD
Serves Crosby, Harris County, TX · 5,130 people served
Federal records show 1 health-based violation and 3 monitoring/reporting issues for Crosby MUD in the last ten years. The most serious issue in this window was a resolved Interim Enhanced Surface Water Treatment Rule violation.
System profile
- Health-based violations, last 10 years
- 1
- Resolved
- 1
- Unresolved
- 0
- Any acute record
- Yes
- Monitoring issues, last 10 years
- 3
Key facts
- Crosby MUD draws water from 2 wells and 1 surface water intake.
- Most recent formal enforcement: compliance order with a penalty by Texas, November 2005.
- Record on file since 1992, with 7 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 0 unknown out of 1,500 service lines.
Check whether Crosby MUD serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Interim Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Oct 1, 2025 | Resolved | Yes |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
Public Notice
OTHER
|
Dec 1, 2025 | Active |
|
Interim Enhanced Surface Water Treatment Rule
Monitoring and reporting
|
Nov 1, 2025 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Lead and Copper Rule
Monitoring and reporting
|
Jul 1, 2025 | Resolved |
Full record since 1992
EPA's records for Crosby MUD go back to 1992. Before October 19, 2016 they list 7 health-based violations (7 resolved) and 8 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1990s | 0 | 1 |
| 2000s | 7 | 4 |
| 2010 to October 18, 2016 | 0 | 3 |
| 2020s | 1 | 3 |
Most recent health-based violation before October 19, 2016: Total Trihalomethanes (TTHMs), began January 2005, Resolved.
Show all 7 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Total Trihalomethanes (TTHMs)
Contaminant limit exceeded
Measured 0.102 mg/L, federal limit 0.08 mg/L (1.3 times the limit)
|
Jan 1, 2005 | Resolved |
|
Haloacetic Acids (HAA5)
Contaminant limit exceeded
Measured 0.07 mg/L, federal limit 0.06 mg/L (1.2 times the limit)
|
Jan 1, 2005 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Nov 1, 2004 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Nov 1, 2004 | Resolved |
|
Haloacetic Acids (HAA5)
Contaminant limit exceeded
Measured 0.08 mg/L, federal limit 0.06 mg/L (1.3 times the limit)
|
Oct 1, 2004 | Resolved |
|
Haloacetic Acids (HAA5)
Contaminant limit exceeded
Measured 0.061 mg/L, federal limit 0.06 mg/L (at or just above the limit)
|
Jul 1, 2004 | Resolved |
|
Total Trihalomethanes (TTHMs)
Contaminant limit exceeded
Measured 0.093 mg/L, federal limit 0.08 mg/L (1.2 times the limit)
|
Jul 1, 2004 | Resolved |
Enforcement actions
Texas regulators took 1 formal enforcement action against Crosby MUD in 2005. The most recent was a compliance order with a penalty in November 2005.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Nov 24, 2005 | Texas | Compliance order with a penalty | 5 violations (5 health-based): Total Trihalomethanes (TTHMs), Haloacetic Acids (HAA5) |
What the violations mean
Interim Enhanced Surface Water Treatment Rule
1 incidentThe system did not meet a filtration or treatment requirement for surface water
Inadequate treatment of surface water can let pathogens such as Cryptosporidium and Giardia through
Where the water comes from
Crosby MUD draws water from 2 wells and 1 surface water intake. It also buys water from San Jacinto River Authority Highlands.
Buys water from
- San Jacinto River Authority Highlands Conroe, TX
Annual water quality report
Crosby MUD must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Where the state allows it, systems serving fewer than 10,000 people may publish the report in a local newspaper or news site instead of mailing it, and must provide a copy on request.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Texas.
Certified drinking water labs by state EPA guidance for private wells