Public water system record

West Baton Rouge Water Works District 2

Serves an area of West Baton Rouge Parish, LA that includes Addis and Brusly · 13,437 people served

Federal records show no health-based violations and 3 monitoring/reporting issues for West Baton Rouge Water Works District 2 in the last ten years.

  • LA1121018
  • PORT ALLEN
  • LA
  • 13,437 served

System profile

Source water Groundwater
ZIP 70767
EPA system ID LA1121018

Verify this system on EPA ECHO →

Health-based violations, last 10 years
0
Resolved
0
Unresolved
0
Any acute record
No
Monitoring issues, last 10 years
3

Key facts

  • West Baton Rouge Water Works District 2 draws water from 4 wells (1 of them for emergency, seasonal or other part-time use).
  • Most recent formal enforcement: compliance order (no penalty) by Louisiana, January 2013.
  • Record on file since 1991, with 6 health-based violations before October 19, 2016.
  • Lead pipe inventory: 0 lead and 0 unknown out of 5,112 service lines.

Check whether West Baton Rouge Water Works District 2 serves your address

Address suggestions by Mapbox

Health-based violations

Since October 2016

Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.

None since October 2016.

Monitoring and reporting issues

Since October 2016

Missed tests or reports, not contaminants found above a limit.

Issue Start date Status
E. coli
Monitoring and reporting
Jul 27, 2010 Resolved
Stage 2 Disinfection Byproducts Rule
Monitoring and reporting
Jul 2, 2010 Resolved
E. coli
Monitoring and reporting
Jul 1, 2010 Resolved

Full record since 1991

EPA's records for West Baton Rouge Water Works District 2 go back to 1991. Before October 19, 2016 they list 6 health-based violations (4 resolved, 2 archived by EPA without a recorded fix) and 7 monitoring or reporting violations.

Violations that began in Health-based Monitoring and reporting
1990s 2 0
2000s 2 2
2010 to October 18, 2016 2 5

Most recent health-based violation before October 19, 2016: Total Coliform, began December 2011, Resolved.

Show all 6 health-based violations before October 19, 2016
Contaminant Start date Status
Total Coliform
Contaminant limit exceeded
Dec 1, 2011 Resolved
Total Coliform
Contaminant limit exceeded
Jul 1, 2010 Resolved
Total Coliform
Contaminant limit exceeded
Sep 1, 2009 Resolved
Total Coliform
Contaminant limit exceeded
Oct 1, 2008 Resolved
Total Coliform
Contaminant limit exceeded
Mar 1, 1992 Archived
Total Coliform
Contaminant limit exceeded
Jul 1, 1991 Archived

Enforcement actions

Louisiana regulators took 1 formal enforcement action against West Baton Rouge Water Works District 2 in 2013. The most recent was a compliance order (no penalty) in January 2013.

Date By Action Violations covered
Jan 31, 2013 Louisiana Compliance order (no penalty) 11 violations (4 health-based): Groundwater Rule, Total Trihalomethanes (TTHMs), Total Coliform, Public Notice, Haloacetic Acids (HAA5)

Where the water comes from

West Baton Rouge Water Works District 2 draws water from 4 wells (1 of them for emergency, seasonal or other part-time use).

Annual water quality report

West Baton Rouge Water Works District 2 must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.

Systems serving 10,000 or more people must mail or deliver the report to every customer, and from 2027 they must send it twice a year.

Find a posted report with EPA's Consumer Confidence Report search

Testing your own water

To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Louisiana.