Public water system record

Christmas Tree - Sundown Condominium

Serves an area of Washington County, VT · 110 people served

Federal records show 18 health-based violations and 3 monitoring/reporting issues for Christmas Tree - Sundown Condominium in the last ten years. The most serious issue in this window was a Combined Radium (-226 and -228) violation that EPA lists as archived, not resolved.

  • VT0005589
  • WAITSFIELD
  • VT
  • 110 served

System profile

Source water Groundwater
ZIP 05673
EPA system ID VT0005589

Verify this system on EPA ECHO →

Health-based violations, last 10 years
18
Resolved
0
Unresolved
0
Archived by EPA
18
Any acute record
No
Monitoring issues, last 10 years
3

Key facts

  • Christmas Tree - Sundown Condominium draws water from 1 well.
  • Highest measured level in the last 10 years: Combined Radium (-226 and -228), 8 pCi/L, federal limit 5 pCi/L (1.6 times the limit), 2025.
  • Most recent enforcement action: boil water order by Vermont, September 2015.
  • Record on file since 1993, with 11 health-based violations before October 19, 2016.
  • Lead pipe inventory: 0 lead and 0 unknown out of 19 service lines.

Check whether Christmas Tree - Sundown Condominium serves your address

Address suggestions by Mapbox

Health-based violations

Since October 2016

Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.

Contaminant Rule family Start date Status Acute
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 8 pCi/L, federal limit 5 pCi/L (1.6 times the limit)
340 Oct 1, 2025 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Jul 1, 2025 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Apr 1, 2025 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Jan 1, 2025 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Oct 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Jul 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 8 pCi/L, federal limit 5 pCi/L (1.6 times the limit)
340 Apr 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Jan 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Oct 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7 pCi/L, federal limit 5 pCi/L (1.4 times the limit)
340 Jul 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Apr 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Jan 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Oct 1, 2022 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Jul 1, 2022 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Apr 1, 2022 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Jan 1, 2022 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Oct 1, 2021 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
340 Jul 1, 2021 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
No

Monitoring and reporting issues

Since October 2016

Missed tests or reports, not contaminants found above a limit.

Issue Start date Status
Revised Total Coliform Rule
Monitoring violation
Feb 1, 2025 Resolved
Lead and Copper Rule
Monitoring and reporting
Jan 1, 2023 Resolved
Combined Uranium
Monitoring and reporting
Jul 1, 2020 Resolved

Full record since 1993

EPA's records for Christmas Tree - Sundown Condominium go back to 1993. Before October 19, 2016 they list 11 health-based violations (10 resolved, 1 archived by EPA without a recorded fix) and 8 monitoring or reporting violations.

Violations that began in Health-based Monitoring and reporting
1990s 1 1
2000s 3 6
2010 to October 18, 2016 7 1
2020s 18 3

Most recent health-based violation before October 19, 2016: Total Coliform, began September 2015, Resolved.

Show all 11 health-based violations before October 19, 2016
Contaminant Start date Status
Total Coliform
Contaminant limit exceeded
Sep 1, 2015 Resolved
Total Coliform
Contaminant limit exceeded
Sep 1, 2014 Resolved
Total Coliform
Contaminant limit exceeded
May 1, 2014 Resolved
Total Coliform
Contaminant limit exceeded
Dec 1, 2012 Resolved
Total Coliform
Contaminant limit exceeded
Nov 1, 2011 Resolved
Total Coliform
Contaminant limit exceeded
Jun 1, 2011 Resolved
Total Coliform
Contaminant limit exceeded
Dec 1, 2010 Resolved
Lead and Copper Rule
Treatment technique failure
Apr 1, 2007 Resolved
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Jan 1, 2000 Resolved
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Jan 1, 2000 Archived
Total Coliform
Contaminant limit exceeded
Aug 1, 1993 Resolved

Enforcement actions

Vermont regulators issued 7 boil water orders to Christmas Tree - Sundown Condominium between 2010 and 2015. The most recent was a boil water order in September 2015.

Date By Action Violations covered
Sep 14, 2015 Vermont Boil water order 1 violation (1 health-based): Total Coliform
Sep 19, 2014 Vermont Boil water order 1 violation (1 health-based): Total Coliform
May 16, 2014 Vermont Boil water order 1 violation (1 health-based): Total Coliform
Dec 10, 2012 Vermont Boil water order 1 violation (1 health-based): Total Coliform
Nov 17, 2011 Vermont Boil water order 1 violation (1 health-based): Total Coliform
Jun 15, 2011 Vermont Boil water order 1 violation (1 health-based): Total Coliform
Dec 10, 2010 Vermont Boil water order 1 violation (1 health-based): Total Coliform

What the violations mean

Combined Radium (-226 and -228)

18 incidents

Test results for Combined Radium (-226 and -228) were above the federal limit (a maximum contaminant level violation).

The utility had to notify customers about each of these violations.

Where the water comes from

Christmas Tree - Sundown Condominium draws water from 1 well.

Annual water quality report

Christmas Tree - Sundown Condominium must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.

Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Christmas Tree - Sundown Condominium for a copy.

Find a posted report with EPA's Consumer Confidence Report search

Testing your own water

To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Vermont.