Public water system record

Putnams Landing

Serves West Livingston, Polk County, TX · 372 people served

Federal records show 5 health-based violations and 5 monitoring/reporting issues for Putnams Landing in the last ten years. The most serious issue in this window was a resolved Arsenic violation.

  • TX1870045
  • LIVINGSTON
  • TX
  • 372 served

System profile

Source water Groundwater
ZIP 77351
EPA system ID TX1870045

Verify this system on EPA ECHO →

Health-based violations, last 10 years
5
Resolved
5
Unresolved
0
Any acute record
No
Monitoring issues, last 10 years
5

Key facts

  • Putnams Landing draws water from 2 wells.
  • Highest measured level in the last 10 years: Arsenic, 0.012 mg/L, federal limit 0.01 mg/L (1.2 times the limit), 2024.
  • Most recent formal enforcement: compliance order (no penalty) by Texas, September 2025.
  • Lead pipe inventory: 0 lead and 0 unknown out of 128 service lines.

Check whether Putnams Landing serves your address

Address suggestions by Mapbox

Health-based violations

Since October 2016

Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.

Contaminant Rule family Start date Status Acute
Arsenic
Contaminant limit exceeded
Measured 0.011 mg/L, federal limit 0.01 mg/L (1.1 times the limit)
330 Jan 1, 2025 Resolved No
LEAD AND COPPER RULE REVISIONS
Treatment technique failure
350 Oct 17, 2024 Resolved No
Arsenic
Contaminant limit exceeded
Measured 0.012 mg/L, federal limit 0.01 mg/L (1.2 times the limit)
330 Oct 1, 2024 Resolved No
Arsenic
Contaminant limit exceeded
Measured 0.012 mg/L, federal limit 0.01 mg/L (1.2 times the limit)
330 Jul 1, 2024 Resolved No
Arsenic
Contaminant limit exceeded
Measured 0.012 mg/L, federal limit 0.01 mg/L (1.2 times the limit)
330 Jan 1, 2024 Resolved No

Monitoring and reporting issues

Since October 2016

Missed tests or reports, not contaminants found above a limit.

Issue Start date Status
Public Notice
OTHER
May 1, 2025 Resolved
LEAD AND COPPER RULE REVISIONS
RPT
Oct 17, 2024 Resolved
Revised Total Coliform Rule
Monitoring violation
Sep 1, 2024 Resolved
Public Notice
OTHER
Jun 22, 2024 Resolved
Lead and Copper Rule
Monitoring and reporting
Dec 30, 2016 Resolved

Enforcement actions

Texas regulators took 1 formal enforcement action against Putnams Landing in 2025. The most recent was a compliance order (no penalty) in September 2025.

Date By Action Violations covered
Sep 30, 2025 Texas Compliance order (no penalty) 3 violations (3 health-based): Arsenic

What the violations mean

Arsenic

4 incidents

Arsenic exceeded the federal limit

Long-term arsenic exposure is linked to cancer and cardiovascular effects

LEAD AND COPPER RULE REVISIONS

1 incident

The system did not complete a treatment step or action that the LEAD AND COPPER RULE REVISIONS requires (a treatment technique violation).

The utility had to notify customers about this violation.

Where the water comes from

Putnams Landing draws water from 2 wells. It also has an emergency connection to Lake Livingston Estates 2 & 3. 1 other public water system has an emergency connection to Putnams Landing.

Emergency or part-time connections to

Annual water quality report

Putnams Landing must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.

Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Putnams Landing for a copy.

Find a posted report with EPA's Consumer Confidence Report search

Testing your own water

To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Texas.