Public water system record
Acton MUD
Serves Pecan Plantation and DeCordova, Hood County, TX · 20,458 people served
Federal records show 1 health-based violation and 65 monitoring/reporting issues for Acton MUD in the last ten years. The most serious issue in this window was a resolved Cadmium violation.
System profile
- Health-based violations, last 10 years
- 1
- Resolved
- 1
- Unresolved
- 0
- Any acute record
- No
- Monitoring issues, last 10 years
- 65
Key facts
- Acton MUD draws water from 23 wells and 1 surface water intake (1 of them for emergency, seasonal or other part-time use).
- Highest measured level in the last 10 years: Cadmium, 0.006 mg/L, federal limit 0.005 mg/L (1.2 times the limit), 2016.
- Most recent formal enforcement: compliance order with a penalty by Texas, April 2012.
- Record on file since 1992, with 7 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 0 unknown out of 9,071 service lines.
Check whether Acton MUD serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Cadmium
Contaminant limit exceeded
Measured 0.006 mg/L, federal limit 0.005 mg/L (1.2 times the limit)
|
330 | Oct 1, 2016 | Resolved | No |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
2,4,5-TP
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
2,4-D
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Dinoseb
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Picloram
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Dalapon
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
2,4,5-TP
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
2,4-D
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Dinoseb
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Picloram
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Dalapon
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Aldicarb
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Carbofuran
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Aldicarb sulfone
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Aldicarb sulfoxide
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
OXAMYL
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
ETHYLENE DIBROMIDE
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
1,2-DIBROMO-3-CHLOROPROPANE
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Fluoride
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Fluoride
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Aldicarb
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Carbofuran
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Aldicarb sulfone
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Aldicarb sulfoxide
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
OXAMYL
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
ETHYLENE DIBROMIDE
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
1,2-DIBROMO-3-CHLOROPROPANE
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
CYANIDE
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
CYANIDE
Monitoring and reporting
|
Jan 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Chlordane
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Pentachlorophenol
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Benzo(a)pyrene
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
HEXACHLOROBENZENE
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Heptachlor epoxide
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Heptachlor
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
LASSO
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Atrazine
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Hexachlorocyclopentadiene
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Di(2-ethylhexyl) phthalate
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Simazine
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Di(2-ethylhexyl) adipate
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Toxaphene
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Methoxychlor
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
BHC-GAMMA
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Endrin
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Selenium
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Thallium, Total
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Beryllium, Total
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Antimony, Total
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Mercury
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Chromium (total)
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Cadmium
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Barium
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Arsenic
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Selenium
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Thallium, Total
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Beryllium, Total
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Antimony, Total
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Mercury
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Chromium (total)
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Cadmium
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Barium
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Arsenic
Monitoring and reporting
|
Jan 1, 2020 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
|
Public Notice
OTHER
|
Apr 30, 2018 | Resolved |
|
Public Notice
OTHER
|
Apr 30, 2018 | Resolved |
|
Lead and Copper Rule
Monitoring and reporting
|
Dec 30, 2016 | Resolved |
Full record since 1992
EPA's records for Acton MUD go back to 1992. Before October 19, 2016 they list 7 health-based violations (6 resolved, 1 archived by EPA without a recorded fix) and 5 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1990s | 1 | 2 |
| 2000s | 1 | 0 |
| 2010 to October 18, 2016 | 5 | 3 |
| October 19, 2016 to 2019 | 0 | 3 |
| 2020s | 0 | 62 |
Most recent health-based violation before October 19, 2016: Cadmium, began October 2016, Resolved.
Show all 7 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Cadmium
Contaminant limit exceeded
Measured 0.006 mg/L, federal limit 0.005 mg/L (1.2 times the limit)
|
Oct 1, 2016 | Resolved |
|
Cadmium
Contaminant limit exceeded
Measured 0.008 mg/L, federal limit 0.005 mg/L (1.6 times the limit)
|
Jul 1, 2016 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Sep 1, 2011 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
May 1, 2011 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Aug 1, 2010 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Oct 1, 2009 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Nov 1, 1992 | Archived |
Enforcement actions
Texas regulators took 1 formal enforcement action against Acton MUD in 2012. The most recent was a compliance order with a penalty in April 2012.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Apr 4, 2012 | Texas | Compliance order with a penalty | 3 violations (2 health-based): E. coli, Total Coliform |
What the violations mean
Cadmium
1 incidentTest results for Cadmium were above the federal limit (a maximum contaminant level violation).
The utility had to notify customers about this violation.
Where the water comes from
Acton MUD draws water from 23 wells and 1 surface water intake (1 of them for emergency, seasonal or other part-time use). It also has an emergency connection to City of Granbury. 6 other community water systems buy water from Acton MUD. 1 other public water system has an emergency connection to Acton MUD.
Emergency or part-time connections to
- City of Granbury Granbury, TX
Community systems that buy water from it
- Acton Water Royal Oaks Austin, TX
- Canyon Creek Addition Austin, TX
- Comanche Harbor & Port Ocall Austin, TX
- Johnson County SUD Joshua, TX
- Montego Bay Estates Austin, TX
- Rancho Brazos Subdivision Austin, TX
Annual water quality report
Acton MUD must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Systems serving 10,000 or more people must mail or deliver the report to every customer, and from 2027 they must send it twice a year.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Texas.
Certified drinking water labs by state EPA guidance for private wells