Public water system record
Pojoaque Terraces MHP
Serves Pojoaque, Santa Fe County, NM · 160 people served
Federal records show 21 health-based violations and 7 monitoring/reporting issues for Pojoaque Terraces MHP in the last ten years. The most serious issue in this window was a Combined Uranium violation that EPA lists as archived, not resolved.
System profile
- Health-based violations, last 10 years
- 21
- Resolved
- 4
- Unresolved
- 0
- Archived by EPA
- 17
- Any acute record
- No
- Monitoring issues, last 10 years
- 7
Key facts
- Pojoaque Terraces MHP draws water from 1 well.
- Highest measured level in the last 10 years: Combined Uranium, 79 µg/L, federal limit 30 µg/L (2.6 times the limit), 2025.
- Most recent formal enforcement: compliance order (no penalty) by New Mexico, December 2022.
- Record on file since 1981, with 2 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 0 unknown out of 68 service lines.
Check whether Pojoaque Terraces MHP serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Combined Uranium
Contaminant limit exceeded
Measured 78 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Jul 1, 2025 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 79 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Apr 1, 2025 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 78 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Jan 1, 2025 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 77 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Oct 1, 2024 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 76 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Jul 1, 2024 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 73 µg/L, federal limit 30 µg/L (2.4 times the limit)
|
340 | Apr 1, 2024 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 74 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Jan 1, 2024 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 75 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Oct 1, 2023 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 76 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Jul 1, 2023 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 76 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Apr 1, 2023 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 76 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Jan 1, 2023 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Groundwater Rule
Treatment technique failure
|
140 | Dec 2, 2022 | Resolved | No |
|
Groundwater Rule
Treatment technique failure
|
140 | Dec 2, 2022 | Resolved | No |
|
Groundwater Rule
Treatment technique failure
|
140 | Dec 2, 2022 | Resolved | No |
|
Groundwater Rule
Treatment technique failure
|
140 | Dec 2, 2022 | Resolved | No |
|
Combined Uranium
Contaminant limit exceeded
Measured 76 µg/L, federal limit 30 µg/L (2.5 times the limit)
|
340 | Oct 1, 2022 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 77 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Jul 1, 2022 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 77 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Apr 1, 2022 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 79 µg/L, federal limit 30 µg/L (2.6 times the limit)
|
340 | Jan 1, 2022 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 60 µg/L, federal limit 30 µg/L (2 times the limit)
|
340 | Oct 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
|
Combined Uranium
Contaminant limit exceeded
Measured 40 µg/L, federal limit 30 µg/L (1.3 times the limit)
|
340 | Jul 1, 2021 |
Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
|
No |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
Public Notice
OTHER
|
Apr 30, 2023 | Resolved |
|
Public Notice
OTHER
|
Jul 9, 2022 | Resolved |
|
Public Notice
OTHER
|
Apr 29, 2022 | Resolved |
|
Haloacetic Acids (HAA5)
Monitoring and reporting
|
Sep 1, 2019 | Resolved |
|
Total Trihalomethanes (TTHMs)
Monitoring and reporting
|
Sep 1, 2019 | Resolved |
|
Consumer Confidence Rule
OTHER
|
Jul 1, 2018 | Resolved |
|
Lead and Copper Rule
Monitoring and reporting
|
Oct 1, 2010 | Resolved |
Full record since 1981
EPA's records for Pojoaque Terraces MHP go back to 1981. Before October 19, 2016 they list 2 health-based violations (2 resolved) and 24 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1980s | 0 | 13 |
| 1990s | 2 | 7 |
| 2000s | 0 | 2 |
| 2010 to October 18, 2016 | 0 | 2 |
| October 19, 2016 to 2019 | 0 | 3 |
| 2020s | 21 | 3 |
Most recent health-based violation before October 19, 2016: Total Coliform, began December 1995, Resolved.
Show all 2 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Total Coliform
Contaminant limit exceeded
|
Dec 1, 1995 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Sep 1, 1995 | Resolved |
Enforcement actions
New Mexico regulators and EPA took 2 formal enforcement actions against Pojoaque Terraces MHP between 1996 and 2022. The most recent was a compliance order (no penalty) in December 2022.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Dec 27, 2022 | New Mexico | Compliance order (no penalty) | 12 violations (12 health-based): Combined Uranium |
| Sep 17, 1996 | EPA | Compliance order (no penalty) | 7 violations (2 health-based): Total Coliform |
What the violations mean
Combined Uranium
17 incidentsTest results for Combined Uranium were above the federal limit (a maximum contaminant level violation).
The utility had to notify customers about each of these violations.
Groundwater Rule
4 incidentsThe system did not complete a treatment step or action that the Groundwater Rule requires (a treatment technique violation).
The utility had to notify customers about each of these violations.
Where the water comes from
Pojoaque Terraces MHP draws water from 1 well.
Annual water quality report
Pojoaque Terraces MHP must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Pojoaque Terraces MHP for a copy.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by New Mexico.
Certified drinking water labs by state EPA guidance for private wells