Public water system record

Horseshoe Mobile Estates

Serves an area of Wake County, NC that includes Garner · 255 people served

Federal records show 3 health-based violations and 11 monitoring/reporting issues for Horseshoe Mobile Estates in the last ten years. The most serious issue in this window was a Nitrate violation that EPA lists as archived, not resolved.

  • NC0392113
  • CHAPEL HILL
  • NC
  • 255 served

System profile

Source water Groundwater
ZIP 27517
EPA system ID NC0392113

Verify this system on EPA ECHO →

Health-based violations, last 10 years
3
Resolved
2
Unresolved
0
Archived by EPA
1
Any acute record
Yes
Monitoring issues, last 10 years
11

Key facts

  • Horseshoe Mobile Estates draws water from 2 wells.
  • Highest measured level in the last 10 years: Nitrate, 11 mg/L, federal limit 10 mg/L (1.1 times the limit), 2024.
  • Most recent formal enforcement: compliance order (no penalty) by North Carolina, October 2025.
  • Record on file since 1980, with 3 health-based violations before October 19, 2016.
  • Lead pipe inventory: 0 lead and 101 unknown out of 110 service lines.

Check whether Horseshoe Mobile Estates serves your address

Address suggestions by Mapbox

Health-based violations

Since October 2016

Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.

Contaminant Rule family Start date Status Acute
Nitrate
Contaminant limit exceeded
Measured 11 mg/L, federal limit 10 mg/L (1.1 times the limit)
330 Jan 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Yes
Lead and Copper Rule
Treatment technique failure
350 Apr 1, 2017 Resolved No
Lead and Copper Rule
Treatment technique failure
350 Dec 2, 2016 Resolved No

Monitoring and reporting issues

Since October 2016

Missed tests or reports, not contaminants found above a limit.

Issue Start date Status
Revised Total Coliform Rule
RPT
Feb 1, 2025 Resolved
Haloacetic Acids (HAA5)
Monitoring and reporting
Jan 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Total Trihalomethanes (TTHMs)
Monitoring and reporting
Jan 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Public Notice
OTHER
Sep 23, 2017 Active
Enforcement action in place
Public Notice
OTHER
Sep 23, 2017 Active
Enforcement action in place
Public Notice
OTHER
Sep 23, 2017 Active
Enforcement action in place
Public Notice
OTHER
Apr 28, 2017 Active
Enforcement action in place
Nitrate
Monitoring and reporting
Apr 1, 2017 Resolved
Lead and Copper Rule
Monitoring and reporting
Apr 1, 2017 Resolved
Lead and Copper Rule
Monitoring and reporting
Oct 1, 2016 Resolved
Lead and Copper Rule
Monitoring and reporting
Oct 1, 2016 Resolved

Full record since 1980

EPA's records for Horseshoe Mobile Estates go back to 1980. Before October 19, 2016 they list 3 health-based violations (3 resolved) and 96 monitoring or reporting violations.

Violations that began in Health-based Monitoring and reporting
1980s 0 16
1990s 0 4
2000s 3 74
2010 to October 18, 2016 0 2
October 19, 2016 to 2019 2 6
2020s 1 3

Most recent health-based violation before October 19, 2016: Lead and Copper Rule, began July 2002, Resolved.

Show all 3 health-based violations before October 19, 2016
Contaminant Start date Status
Lead and Copper Rule
Treatment technique failure
Jul 1, 2002 Resolved
Lead and Copper Rule
Treatment technique failure
Dec 31, 2001 Resolved
Lead and Copper Rule
Treatment technique failure
Jul 1, 2000 Resolved

Enforcement actions

North Carolina regulators took 16 formal enforcement actions against Horseshoe Mobile Estates and issued 1 boil water order between 2007 and 2025, filed as 21 records in EPA's data. The most recent was a compliance order (no penalty) in October 2025.

Date By Action Violations covered
Oct 24, 2025 North Carolina Compliance order (no penalty) 2 violations: Total Trihalomethanes (TTHMs), Haloacetic Acids (HAA5)
May 6, 2025 North Carolina Compliance order (no penalty) 1 violation: Revised Total Coliform Rule
Dec 31, 2024 North Carolina Compliance order (no penalty) 1 violation (1 health-based): Nitrate
Dec 31, 2024 North Carolina Boil water order 1 violation (1 health-based): Nitrate
Mar 16, 2018 North Carolina Compliance order with a penalty 3 violations (1 health-based): Lead and Copper Rule
Feb 23, 2018 North Carolina Compliance order with a penalty 1 violation: Nitrate
Oct 12, 2017 North Carolina Compliance order (no penalty) 3 violations: Public Notice
Aug 23, 2017 North Carolina Compliance order (no penalty) 3 violations (1 health-based): Lead and Copper Rule
Jul 21, 2017 North Carolina Compliance order (no penalty) 1 violation: Public Notice
Jul 11, 2017 North Carolina Compliance order (no penalty) 1 violation: Nitrate
Jun 12, 2017 North Carolina Compliance order (no penalty) 1 violation: Lead and Copper Rule
Mar 28, 2017 North Carolina Compliance order (no penalty) 1 violation (1 health-based): Lead and Copper Rule
Jan 16, 2009 North Carolina Compliance order with a penalty 21 violations: 1,2,4-Trichlorobenzene, cis-1,2-Dichloroethylene, Xylenes, Total, Vinyl chloride, 1,1-Dichloroethylene
Aug 7, 2008 North Carolina Compliance order with a penalty 20 violations: Radium-228, Gross Alpha, Excl. Radon and U, Combined Uranium, Radium-226, Combined Radium (-226 and -228)
Jun 13, 2008 North Carolina Compliance order with a penalty 6 violations: Total Trihalomethanes (TTHMs), Haloacetic Acids (HAA5)
May 23, 2008 North Carolina Compliance order with a penalty 1 violation: Di(2-ethylhexyl) adipate
Nov 14, 2007 North Carolina Compliance order with a penalty 1 violation: Di(2-ethylhexyl) adipate

What the violations mean

Lead and Copper Rule

2 incidents

The system did not complete a treatment step or action that the Lead and Copper Rule requires (a treatment technique violation).

The utility had to notify customers about each of these violations.

Nitrate

1 incident

Nitrate exceeded the federal limit

High nitrate is especially dangerous for infants under 6 months and can cause blue baby syndrome

Where the water comes from

Horseshoe Mobile Estates draws water from 2 wells.

Annual water quality report

Horseshoe Mobile Estates must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.

Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Horseshoe Mobile Estates for a copy.

Find a posted report with EPA's Consumer Confidence Report search

Testing your own water

To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by North Carolina.