Public water system record

McNair-Stampley W/A #1

Serves an area of Jefferson County, MS · 1,148 people served

Federal records show 3 health-based violations and 16 monitoring/reporting issues for McNair-Stampley W/A #1 in the last ten years. The most serious issue in this window was a resolved Groundwater Rule violation.

  • MS0320003
  • FAYETTE
  • MS
  • 1,148 served

System profile

Source water Groundwater
ZIP 39069
EPA system ID MS0320003

Verify this system on EPA ECHO →

Health-based violations, last 10 years
3
Resolved
3
Unresolved
0
Any acute record
No
Monitoring issues, last 10 years
16

Key facts

  • McNair-Stampley W/A #1 draws water from 1 well.
  • Most recent enforcement action: boil water order by Mississippi, July 2008.
  • Record on file since 1980, with 4 health-based violations before October 19, 2016.
  • Lead pipe inventory: 0 lead and 0 unknown out of 1,092 service lines.

Check whether McNair-Stampley W/A #1 serves your address

Address suggestions by Mapbox

Health-based violations

Since October 2016

Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.

Contaminant Rule family Start date Status Acute
Groundwater Rule
Treatment technique failure
140 Nov 15, 2019 Resolved No
Groundwater Rule
Treatment technique failure
140 Nov 15, 2019 Resolved No
Groundwater Rule
Treatment technique failure
140 Nov 15, 2019 Resolved No

Monitoring and reporting issues

Since October 2016

Missed tests or reports, not contaminants found above a limit.

Issue Start date Status
Haloacetic Acids (HAA5)
Monitoring and reporting
Jan 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Total Trihalomethanes (TTHMs)
Monitoring and reporting
Jan 1, 2024 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Haloacetic Acids (HAA5)
Monitoring and reporting
Jan 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Total Trihalomethanes (TTHMs)
Monitoring and reporting
Jan 1, 2023 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Lead and Copper Rule
Monitoring and reporting
Jan 1, 2021 Resolved
Revised Total Coliform Rule
Monitoring violation
Nov 1, 2020 Resolved
Chlorine
Monitoring and reporting
Oct 1, 2020 Resolved
Revised Total Coliform Rule
Monitoring violation
Oct 1, 2020 Resolved
Revised Total Coliform Rule
Monitoring violation
Sep 1, 2020 Resolved
Chlorine
Monitoring and reporting
Jul 1, 2020 Resolved
Public Notice
OTHER
Jan 25, 2020 Resolved
Public Notice
OTHER
Jan 6, 2020 Active
Public Notice
OTHER
Jan 6, 2020 Active
Public Notice
OTHER
Jan 6, 2020 Active
Revised Total Coliform Rule
Monitoring violation
Dec 1, 2019 Archived
Violation period ended. EPA no longer counts it toward current compliance, but no fix was formally recorded.
Revised Total Coliform Rule
RPT
Dec 1, 2018 Resolved

Full record since 1980

EPA's records for McNair-Stampley W/A #1 go back to 1980. Before October 19, 2016 they list 4 health-based violations (1 resolved, 3 archived by EPA without a recorded fix) and 81 monitoring or reporting violations.

Violations that began in Health-based Monitoring and reporting
1980s 0 2
1990s 2 3
2000s 1 45
2010 to October 18, 2016 1 31
October 19, 2016 to 2019 3 2
2020s 0 14

Most recent health-based violation before October 19, 2016: Groundwater Rule, began June 2011, Resolved.

Show all 4 health-based violations before October 19, 2016
Contaminant Start date Status
Groundwater Rule
Treatment technique failure
Jun 1, 2011 Resolved
Total Coliform
Contaminant limit exceeded
Jul 1, 2008 Archived
Total Coliform
Contaminant limit exceeded
Apr 1, 1995 Archived
Total Coliform
Contaminant limit exceeded
Mar 1, 1991 Archived

Enforcement actions

Mississippi regulators issued 2 boil water orders to McNair-Stampley W/A #1 between 1995 and 2008. The most recent was a boil water order in July 2008.

Date By Action Violations covered
Jul 10, 2008 Mississippi Boil water order 1 violation (1 health-based): Total Coliform
Apr 18, 1995 Mississippi Boil water order 1 violation

What the violations mean

Groundwater Rule

3 incidents

The system did not complete a treatment step or action that the Groundwater Rule requires (a treatment technique violation).

The utility had to notify customers about each of these violations.

Where the water comes from

McNair-Stampley W/A #1 draws water from 1 well.

Annual water quality report

McNair-Stampley W/A #1 must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.

Where the state allows it, systems serving fewer than 10,000 people may publish the report in a local newspaper or news site instead of mailing it, and must provide a copy on request.

Find a posted report with EPA's Consumer Confidence Report search

Testing your own water

To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Mississippi.