Public water system record
Rocky Creek Subdivision
Serves an area of Greene County, GA that includes Greensboro · 62 people served
Federal records show 4 health-based violations and 5 monitoring/reporting issues for Rocky Creek Subdivision in the last ten years. The most serious issue in this window was a resolved Combined Radium (-226 and -228) violation.
System profile
- Health-based violations, last 10 years
- 4
- Resolved
- 4
- Unresolved
- 0
- Any acute record
- No
- Monitoring issues, last 10 years
- 5
Key facts
- Rocky Creek Subdivision draws water from 1 well.
- Highest measured level in the last 10 years: Combined Radium (-226 and -228), 98 pCi/L, federal limit 5 pCi/L (20 times the limit), 2025.
- Most recent formal enforcement: compliance order with a penalty by Georgia, July 2013.
- Record on file since 1994, with 24 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 13 unknown out of 22 service lines.
Check whether Rocky Creek Subdivision serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 98 pCi/L, federal limit 5 pCi/L (20 times the limit)
|
340 | Jan 1, 2025 | Resolved | No |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 98 pCi/L, federal limit 5 pCi/L (20 times the limit)
|
340 | Oct 1, 2024 | Resolved | No |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 98 pCi/L, federal limit 5 pCi/L (20 times the limit)
|
340 | Jul 1, 2024 | Resolved | No |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 74 pCi/L, federal limit 5 pCi/L (15 times the limit)
|
340 | Apr 1, 2024 | Resolved | No |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
E. coli
Monitoring and reporting
|
Oct 9, 2024 | Resolved |
|
Lead and Copper Rule
Monitoring and reporting
|
Oct 1, 2024 | Resolved |
|
Combined Radium (-226 and -228)
Monitoring and reporting
|
Jul 1, 2024 | Resolved |
|
Combined Uranium
Monitoring and reporting
|
Jul 1, 2024 | Resolved |
|
Gross Alpha, Excl. Radon and U
Monitoring and reporting
|
Jul 1, 2024 | Resolved |
Full record since 1994
EPA's records for Rocky Creek Subdivision go back to 1994. Before October 19, 2016 they list 24 health-based violations (20 resolved, 4 archived by EPA without a recorded fix) and 21 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1990s | 0 | 3 |
| 2000s | 8 | 5 |
| 2010 to October 18, 2016 | 16 | 13 |
| 2020s | 4 | 5 |
Most recent health-based violation before October 19, 2016: Combined Radium (-226 and -228), began January 2014, Resolved.
Show all 24 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6 pCi/L, federal limit 5 pCi/L (1.2 times the limit)
|
Jan 1, 2014 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 9 pCi/L, federal limit 5 pCi/L (1.8 times the limit)
|
Oct 1, 2012 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 9.33 pCi/L, federal limit 5 pCi/L (1.9 times the limit)
|
Jul 1, 2012 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 8 pCi/L, federal limit 5 pCi/L (1.6 times the limit)
|
Apr 1, 2012 | Resolved |
|
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Measured 16 pCi/L, federal limit 15 pCi/L (1.1 times the limit)
|
Jan 1, 2012 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 9 pCi/L, federal limit 5 pCi/L (1.8 times the limit)
|
Jan 1, 2012 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 9.25 pCi/L, federal limit 5 pCi/L (1.9 times the limit)
|
Oct 1, 2011 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 9 pCi/L, federal limit 5 pCi/L (1.8 times the limit)
|
Jul 1, 2011 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 10 pCi/L, federal limit 5 pCi/L (2 times the limit)
|
Apr 1, 2011 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 10 pCi/L, federal limit 5 pCi/L (2 times the limit)
|
Jan 1, 2011 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 8.67 pCi/L, federal limit 5 pCi/L (1.7 times the limit)
|
Oct 1, 2010 | Archived |
|
Combined Uranium
Contaminant limit exceeded
|
Oct 1, 2010 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7.75 pCi/L, federal limit 5 pCi/L (1.6 times the limit)
|
Jul 1, 2010 | Archived |
|
Combined Uranium
Contaminant limit exceeded
|
Jul 1, 2010 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7.25 pCi/L, federal limit 5 pCi/L (1.5 times the limit)
|
Apr 1, 2010 | Archived |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6.5 pCi/L, federal limit 5 pCi/L (1.3 times the limit)
|
Jan 1, 2010 | Archived |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 6.3 pCi/L, federal limit 5 pCi/L (1.3 times the limit)
|
Oct 1, 2009 | Resolved |
|
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Measured 19 pCi/L, federal limit 15 pCi/L (1.3 times the limit)
|
Oct 1, 2009 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 7.33 pCi/L, federal limit 5 pCi/L (1.5 times the limit)
|
Jul 1, 2009 | Resolved |
|
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Measured 23 pCi/L, federal limit 15 pCi/L (1.5 times the limit)
|
Jul 1, 2009 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 10 pCi/L, federal limit 5 pCi/L (2 times the limit)
|
Apr 1, 2009 | Resolved |
|
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Measured 30.33 pCi/L, federal limit 15 pCi/L (2 times the limit)
|
Apr 1, 2009 | Resolved |
|
Gross Alpha, Excl. Radon and U
Contaminant limit exceeded
Measured 33.67 pCi/L, federal limit 15 pCi/L (2.2 times the limit)
|
Jan 1, 2009 | Resolved |
|
Combined Radium (-226 and -228)
Contaminant limit exceeded
Measured 12.67 pCi/L, federal limit 5 pCi/L (2.5 times the limit)
|
Jan 1, 2009 | Resolved |
Enforcement actions
Georgia regulators took 2 formal enforcement actions against Rocky Creek Subdivision between 2009 and 2013. The most recent was a compliance order with a penalty in July 2013.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Jul 8, 2013 | Georgia | Compliance order with a penalty | 35 violations (23 health-based): Combined Radium (-226 and -228), Gross Alpha, Excl. Radon and U, Combined Uranium |
| Jan 16, 2009 | Georgia | Signed compliance agreement | 8 violations (8 health-based): Combined Radium (-226 and -228), Gross Alpha, Excl. Radon and U |
What the violations mean
Combined Radium (-226 and -228)
4 incidentsTest results for Combined Radium (-226 and -228) were above the federal limit (a maximum contaminant level violation).
The utility had to notify customers about each of these violations.
Where the water comes from
Rocky Creek Subdivision draws water from 1 well.
Annual water quality report
Rocky Creek Subdivision must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Rocky Creek Subdivision for a copy.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Georgia.
Certified drinking water labs by state EPA guidance for private wells