Public water system record
Ashland Pond Mobile Home Park
Serves an area of Southeastern Connecticut Planning Region, CT · 74 people served
Federal records show 1 health-based violation and 10 monitoring/reporting issues for Ashland Pond Mobile Home Park in the last ten years. The most serious issue in this window was a resolved Revised Total Coliform Rule violation.
System profile
- Health-based violations, last 10 years
- 1
- Resolved
- 1
- Unresolved
- 0
- Any acute record
- No
- Monitoring issues, last 10 years
- 10
Key facts
- Ashland Pond Mobile Home Park draws water from 1 well.
- Most recent formal enforcement: compliance order with a penalty by Connecticut, December 2008.
- Record on file since 1990, with 8 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 0 unknown out of 29 service lines.
Check whether Ashland Pond Mobile Home Park serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Revised Total Coliform Rule
Treatment technique failure
|
110 | Apr 7, 2025 | Resolved | No |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
Public Notice
OTHER
|
Sep 19, 2025 | Active |
|
E. coli
Monitoring and reporting
|
Mar 12, 2025 | Active |
|
Consumer Confidence Rule
OTHER
|
Jul 1, 2019 | Resolved |
|
Lead and Copper Rule
Monitoring and reporting
|
Dec 30, 2018 | Resolved |
|
Consumer Confidence Rule
OTHER
|
Aug 10, 2018 | Resolved |
|
Consumer Confidence Rule
OTHER
|
Jul 1, 2018 | Resolved |
|
Consumer Confidence Rule
OTHER
|
Aug 10, 2017 | Resolved |
|
Consumer Confidence Rule
OTHER
|
Jul 1, 2017 | Resolved |
|
Di(2-ethylhexyl) phthalate
Monitoring and reporting
|
Jul 1, 2017 | Resolved |
|
Lead and Copper Rule
Monitoring and reporting
|
Dec 30, 2015 | Resolved |
Full record since 1990
EPA's records for Ashland Pond Mobile Home Park go back to 1990. Before October 19, 2016 they list 8 health-based violations (8 resolved) and 74 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1990s | 6 | 57 |
| 2000s | 2 | 14 |
| 2010 to October 18, 2016 | 0 | 3 |
| October 19, 2016 to 2019 | 0 | 7 |
| 2020s | 1 | 2 |
Most recent health-based violation before October 19, 2016: Total Coliform, began December 2009, Resolved.
Show all 8 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Total Coliform
Contaminant limit exceeded
|
Dec 1, 2009 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Oct 1, 2003 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Nov 1, 1994 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Oct 1, 1994 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Sep 1, 1994 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Aug 1, 1994 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Jul 1, 1994 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Jul 1, 1993 | Resolved |
Enforcement actions
Connecticut regulators took 8 formal enforcement actions against Ashland Pond Mobile Home Park between 1995 and 2008. The most recent was a compliance order with a penalty in December 2008.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Dec 18, 2008 | Connecticut | Compliance order with a penalty | 3 violations: Total Coliform |
| Oct 6, 2006 | Connecticut | Compliance order with a penalty | 1 violation: Total Coliform |
| May 11, 2004 | Connecticut | Compliance order with a penalty | 1 violation: Total Coliform |
| May 13, 2002 | Connecticut | Compliance order with a penalty | 1 violation: Total Coliform |
| Mar 5, 2002 | Connecticut | Compliance order with a penalty | 1 violation: Total Coliform |
| Nov 22, 1996 | Connecticut | Signed compliance agreement | 1 violation: Lead and Copper Rule |
| Oct 18, 1995 | Connecticut | Compliance order with a penalty | 1 violation: Lead and Copper Rule |
| Oct 17, 1995 | Connecticut | Compliance order with a penalty | 30 violations: ETHYLENE DIBROMIDE, Total Polychlorinated Biphenyls (PCB), Pentachlorophenol, Methoxychlor, BHC-GAMMA |
What the violations mean
Revised Total Coliform Rule
1 incidentThe system did not meet a requirement of the Revised Total Coliform Rule
Coliform and E. coli rules protect against bacteria in the distribution system
Where the water comes from
Ashland Pond Mobile Home Park draws water from 1 well.
Annual water quality report
Ashland Pond Mobile Home Park must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Ashland Pond Mobile Home Park for a copy.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Connecticut.
Certified drinking water labs by state EPA guidance for private wells