Public water system record
Cottonshed Waterworks
Serves an area of Howard County, AR · 62 people served
Federal records show 2 health-based violations and 1 monitoring/reporting issue for Cottonshed Waterworks in the last ten years. The most serious issue in this window was a resolved Stage 1 Disinfection Byproducts Rule violation.
System profile
- Health-based violations, last 10 years
- 2
- Resolved
- 2
- Unresolved
- 0
- Any acute record
- No
- Monitoring issues, last 10 years
- 1
Key facts
- Cottonshed Waterworks draws water from 1 well.
- Most recent formal enforcement: compliance order (no penalty) by Arkansas, March 2018.
- Record on file since 1990, with 17 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 0 unknown out of 12 service lines.
Check whether Cottonshed Waterworks serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
210 | Jan 1, 2018 | Resolved | No |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
210 | Dec 1, 2017 | Resolved | No |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
Revised Total Coliform Rule
Monitoring violation
|
Mar 1, 2022 | Resolved |
Full record since 1990
EPA's records for Cottonshed Waterworks go back to 1990. Before October 19, 2016 they list 17 health-based violations (11 resolved, 6 archived by EPA without a recorded fix) and 30 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1990s | 6 | 21 |
| 2000s | 2 | 5 |
| 2010 to October 18, 2016 | 9 | 4 |
| October 19, 2016 to 2019 | 2 | 0 |
| 2020s | 0 | 1 |
Most recent health-based violation before October 19, 2016: Stage 1 Disinfection Byproducts Rule, began December 2015, Resolved.
Show all 17 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Dec 1, 2015 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Nov 1, 2015 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Oct 1, 2015 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Sep 1, 2015 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Dec 1, 2014 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Nov 1, 2014 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Oct 1, 2014 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Sep 1, 2014 | Resolved |
|
Stage 1 Disinfection Byproducts Rule
Treatment technique failure
|
Aug 1, 2014 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Aug 1, 2006 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Jul 1, 2006 | Resolved |
|
Total Coliform
Contaminant limit exceeded
|
Feb 1, 1999 | Archived |
|
Total Coliform
Contaminant limit exceeded
|
Jan 1, 1999 | Archived |
|
Total Coliform
Contaminant limit exceeded
|
Sep 1, 1998 | Archived |
|
Total Coliform
Contaminant limit exceeded
|
May 1, 1998 | Archived |
|
Total Coliform
Contaminant limit exceeded
|
Apr 1, 1998 | Archived |
|
Total Coliform
Contaminant limit exceeded
|
Feb 1, 1998 | Archived |
Enforcement actions
Arkansas regulators took 4 formal enforcement actions against Cottonshed Waterworks between 1999 and 2018. The most recent was a compliance order (no penalty) in March 2018.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Mar 20, 2018 | Arkansas | Compliance order (no penalty) | 2 violations (2 health-based): Stage 1 Disinfection Byproducts Rule |
| Mar 3, 2016 | Arkansas | Administrative penalty | 4 violations (4 health-based): Stage 1 Disinfection Byproducts Rule |
| Jan 13, 2016 | Arkansas | Compliance order (no penalty) | 3 violations (3 health-based): Stage 1 Disinfection Byproducts Rule |
| Jan 20, 1999 | Arkansas | Compliance order (no penalty) | 15 violations (5 health-based): Total Coliform |
What the violations mean
Stage 1 Disinfection Byproducts Rule
2 incidentsThe system did not meet a treatment requirement of the Stage 1 Disinfectants and Disinfection Byproducts Rule
Byproducts form when disinfectants react with natural material in water. Long-term exposure above federal limits may increase cancer risk
Where the water comes from
Cottonshed Waterworks draws water from 1 well.
Annual water quality report
Cottonshed Waterworks must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Systems serving 500 or fewer people may meet the rule by telling customers the report is available on request, so you may need to ask Cottonshed Waterworks for a copy.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Arkansas.
Certified drinking water labs by state EPA guidance for private wells