Public water system record

Montevallo Water Works & Sewer Board

Serves an area of Shelby County and Chilton County, AL that includes Montevallo · 10,746 people served

Federal records show 1 health-based violation and no monitoring/reporting issues for Montevallo Water Works & Sewer Board in the last ten years, including an unresolved Long Term 2 Enhanced Surface Water Treatment Rule violation.

  • AL0001160
  • MONTEVALLO
  • AL
  • 10,746 served

System profile

Source water Groundwater under direct influence
ZIP 35115
EPA system ID AL0001160

Verify this system on EPA ECHO →

Health-based violations, last 10 years
1
Resolved
0
Unresolved
1
Any acute record
No
Monitoring issues, last 10 years
0

Key facts

  • Montevallo Water Works & Sewer Board draws water from 2 wells and 1 spring.
  • Record on file since 1995, with 4 health-based violations before November 22, 2016.
  • Lead pipe inventory: 0 lead and 0 unknown out of 3,865 service lines.

Check whether Montevallo Water Works & Sewer Board serves your address

Address suggestions by Mapbox

Health-based violations

Since November 2016

Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.

Contaminant Rule family Start date Status Acute
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
120 Aug 2, 2021 Active No

Full record since 1995

EPA's records for Montevallo Water Works & Sewer Board go back to 1995. Before November 22, 2016 they list 4 health-based violations (3 resolved, 1 archived by EPA without a recorded fix) and 22 monitoring or reporting violations.

Violations that began in Health-based Monitoring and reporting
1990s 0 21
2000s 4 1
2020s 1 0

Most recent health-based violation before November 22, 2016: Total Coliform, began June 2002, Archived.

Show all 4 health-based violations before November 22, 2016
Contaminant Start date Status
Total Coliform
Contaminant limit exceeded
Jun 1, 2002 Archived
Tetrachloroethylene
Contaminant limit exceeded
Jan 1, 2002 Resolved
Tetrachloroethylene
Contaminant limit exceeded
Oct 1, 2001 Resolved
Tetrachloroethylene
Contaminant limit exceeded
Jul 1, 2001 Resolved

What the violations mean

Long Term 2 Enhanced Surface Water Treatment Rule

1 incident

The system failed required surface water treatment or filtration standards

Untreated or inadequately treated surface water can contain bacteria and viruses

Where the water comes from

Montevallo Water Works & Sewer Board draws water from 2 wells and 1 spring. It also buys water from Chilton Water Authority. It also has emergency connections to Alabaster Water Board, City of Calera, the WWB of Te and Wilton Water Works. 3 other public water systems have emergency connections to Montevallo Water Works & Sewer Board.

Buys water from

Emergency or part-time connections to

Annual water quality report

Montevallo Water Works & Sewer Board must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.

Systems serving 10,000 or more people must mail or deliver the report to every customer, and from 2027 they must send it twice a year.

Find a posted report with EPA's Consumer Confidence Report search

Testing your own water

To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by Alabama.