Public water system record
Jicarilla Dulce
Serves Dulce, Rio Arriba County, NM · 3,064 people served
Federal records show 14 health-based violations and 9 monitoring/reporting issues for Jicarilla Dulce in the last ten years. The most serious issue in this window was a resolved Interim Enhanced Surface Water Treatment Rule violation.
System profile
- Health-based violations, last 10 years
- 14
- Resolved
- 14
- Unresolved
- 0
- Any acute record
- Yes
- Monitoring issues, last 10 years
- 9
Key facts
- Jicarilla Dulce draws water from 4 surface water intakes.
- Most recent formal enforcement: compliance order (no penalty) by EPA, August 2012.
- Record on file since 1993, with 65 health-based violations before October 19, 2016.
- Lead pipe inventory: 0 lead and 1,211 unknown out of 1,532 service lines.
Check whether Jicarilla Dulce serves your address
Health-based violations
Since October 2016Violation data reflects EPA records through March 2026. For the most current status, visit the EPA ECHO database.
| Contaminant | Rule family | Start date | Status | Acute |
|---|---|---|---|---|
|
Interim Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | May 1, 2019 | Resolved | Yes |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Dec 1, 2018 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Nov 1, 2018 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Sep 1, 2018 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Jun 1, 2018 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | May 1, 2018 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Apr 1, 2017 | Resolved | No |
|
Interim Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Mar 1, 2017 | Resolved | Yes |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Jan 1, 2017 | Resolved | No |
|
Interim Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Jan 1, 2017 | Resolved | Yes |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Dec 1, 2016 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Nov 1, 2016 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Apr 17, 2015 | Resolved | No |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
120 | Jun 2, 2012 | Resolved | No |
Monitoring and reporting issues
Since October 2016Missed tests or reports, not contaminants found above a limit.
| Issue | Start date | Status |
|---|---|---|
|
CARBON, TOTAL
Monitoring and reporting
|
Oct 1, 2018 | Resolved |
|
Surface Water Treatment Rule
Monitoring and reporting
|
Oct 1, 2018 | Resolved |
|
Public Notice
OTHER
|
Sep 22, 2018 | Resolved |
|
Revised Total Coliform Rule
Monitoring violation
|
Aug 1, 2018 | Resolved |
|
Surface Water Treatment Rule
Monitoring and reporting
|
Aug 1, 2018 | Resolved |
|
CARBON, TOTAL
Monitoring and reporting
|
Jul 1, 2018 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Monitoring and reporting
|
Jul 1, 2018 | Resolved |
|
E. coli
Monitoring and reporting
|
Oct 1, 2017 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule
Monitoring and reporting
|
Nov 1, 2016 | Resolved |
Full record since 1993
EPA's records for Jicarilla Dulce go back to 1993. Before October 19, 2016 they list 65 health-based violations (63 resolved, 2 archived by EPA without a recorded fix) and 70 monitoring or reporting violations.
| Violations that began in | Health-based | Monitoring and reporting |
|---|---|---|
| 1990s | 2 | 15 |
| 2000s | 0 | 4 |
| 2010 to October 18, 2016 | 63 | 51 |
| October 19, 2016 to 2019 | 12 | 9 |
Most recent health-based violation before October 19, 2016: Interim Enhanced Surface Water Treatment Rule (acute), began August 2016, Resolved.
Show all 65 health-based violations before October 19, 2016
| Contaminant | Start date | Status |
|---|---|---|
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Aug 1, 2016 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Mar 1, 2016 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jun 1, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
May 1, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Apr 17, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Apr 1, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Mar 1, 2015 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Mar 1, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Feb 1, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jan 1, 2015 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Aug 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jul 1, 2014 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Jun 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jun 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
May 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Apr 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Mar 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Feb 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jan 1, 2014 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Dec 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Nov 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Nov 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Nov 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Oct 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Sep 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Sep 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Sep 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Aug 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Aug 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Aug 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jul 1, 2013 | Resolved |
|
Interim Enhanced Surface Water Treatment Rule (acute)
Treatment technique failure
|
Jul 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jun 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
May 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Apr 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Mar 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Feb 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jan 1, 2013 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Dec 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Nov 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Oct 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Sep 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Aug 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jul 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jun 2, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Jun 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
May 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Apr 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Mar 1, 2012 | Resolved |
|
Long Term 2 Enhanced Surface Water Treatment Rule
Treatment technique failure
|
Feb 1, 2012 | Resolved |
15 older violations are not listed here. EPA ECHO has the complete list.
Enforcement actions
EPA took 2 formal enforcement actions against Jicarilla Dulce in 2012, filed as 3 records in EPA's data. The most recent was a compliance order (no penalty) in August 2012.
| Date | By | Action | Violations covered |
|---|---|---|---|
| Aug 7, 2012 | EPA | Compliance order (no penalty) | 8 violations (5 health-based): Interim Enhanced Surface Water Treatment Rule, Long Term 2 Enhanced Surface Water Treatment Rule |
| Aug 6, 2012 | EPA | Compliance order (no penalty) | 198 violations (114 health-based): Long Term 2 Enhanced Surface Water Treatment Rule, Surface Water Treatment Rule, Haloacetic Acids (HAA5), Total Trihalomethanes (TTHMs), Interim Enhanced Surface Water Treatment Rule |
What the violations mean
Long Term 2 Enhanced Surface Water Treatment Rule
11 incidentsThe system failed required surface water treatment or filtration standards
Untreated or inadequately treated surface water can contain bacteria and viruses
Interim Enhanced Surface Water Treatment Rule
3 incidentsThe system did not meet a filtration or treatment requirement for surface water
Inadequate treatment of surface water can let pathogens such as Cryptosporidium and Giardia through
Where the water comes from
Jicarilla Dulce draws water from 4 surface water intakes.
Annual water quality report
Jicarilla Dulce must give its customers an annual water quality report (Consumer Confidence Report) by July 1, with the levels its tests found in the previous year.
Where the state allows it, systems serving fewer than 10,000 people may publish the report in a local newspaper or news site instead of mailing it, and must provide a copy on request.
Find a posted report with EPA's Consumer Confidence Report search
Testing your own water
To test the water at your tap, or a private well this record does not cover, use a laboratory certified for drinking water by EPA Region 6.
Certified drinking water labs by state EPA guidance for private wells